After a pilot project at the Fenix production plant in Jeseník, Czech Republic, this is the second installation of our SAS battery energy storage system (BESS). In cooperation with Matru s.r.o. on 31.3.2020 we have successfully handed over and put into operation a station with an output of 200 kW / 204 kWh for Strojírny in the city of Rumburk. The operator plans to make greater use of solar production for its own consumption and to minimize consumption from the public distribution network.